building control,
methods of operation
Employing a builder and all the other trades
Employing an architect, surveyor.
Significantly according to Herbie new regulations that came in last October 2012 mean that everything has changed. Quite rightly insulation levels are strictly enforced. The problem is though it can be applied to the whole house. My loft and suspended floors could present a problem.
Things that have gone out the window!
An AGA, solar heating, underfloor heating, timber frame construction, creating a 1st floor. All worth considering though.
What has remained!
A highly glazed structure on two sides that will bring the garden into the house and vice versa.
Kitchen plus sitting area not eating.
Must be able to sit a and face the garden.
Spacious light and airy.
Move boiler out of the kitchen.
Pitched roof.
Flower beds at base of West facing wall.
Lots of clever storage.
Another incarnation

No comments:
Post a Comment